Explore key principles and methods involved in static timing analysis and timing closure, essential for digital design and verification. This quiz challenges your understanding of setup and hold checks, path delays, clock domains, and optimization strategies in integrated circuit design.
In static timing analysis, which scenario represents a setup time violation in a flip-flop receiving data from a combinational logic path with a clock period of 10 nanoseconds?
Explanation: A setup time violation occurs when the data arrives too late before the clock edge, missing the required setup margin, as in option A. Option B actually meets the setup time because data is stable longer than needed. Option C describes a hold time violation, not a setup violation. Option D exceeds setup requirements as data is stable well before the needed setup interval.
Which of the following best defines a critical path in static timing analysis for a synchronous digital circuit?
Explanation: The critical path is the path with the longest propagation delay and thus determines the maximum operating frequency of the circuit. The shortest path is significant for hold checks, not setup checks. Logical effort refers to gate sizing, not path delay. The order of analyzed paths does not determine criticality.
When two flip-flops belong to different, unrelated clock domains, what is the main timing risk that must be considered?
Explanation: Crossing from one clock domain to another can introduce metastability, as the timing relationship is not defined, making this the correct answer. While setup and hold violations are concerns within the same domain, they do not address clock domain boundaries specifically. Static power consumption is unrelated, and glitches in logic typically result from logic hazards, not clock crossings.
Which technique can be used to improve timing closure when a design is failing setup time due to a long combinational path?
Explanation: Adding pipeline stages splits a long combinational path into shorter ones, allowing the design to meet timing requirements. Reducing hold margin is unsafe and can cause other violations. Increasing supply voltage must be managed carefully and is not always permitted. Decreasing clock frequency may help, but it can reduce overall performance and is not always desirable.
In static timing analysis, what does it mean to declare a path as a 'false path'?
Explanation: A false path is a timing path that, due to design logic or operational modes, will never be active during regular operation and thus can be ignored in timing checks. The path does exist physically, so option A is incorrect. Option B confuses simulation artifacts with physical realization. Option D is misleading since false paths are specifically not critical and are intentionally excluded from standard checking.